Rajawali project phase 2 is a new building project with a site area of about 55,000 m2 and 20,000 m2 Gross Floor Area designed and built according to LEED standards. From the conceptual designs up to the hand-over date, Royal HaskoningDHV was the design consultant (full-package Architectural, Civil, Mechanical and Electrical), construction manager, HSE as well as LEED consultant to Jotun Indonesia.
LEED is a sustainability certification system which has been developed in the USA and stands for ‘Leadership in Energy & Environmental Design’ developed by the US Green Building Council and administered by the Green Building Certification Institute (GBCI). GBCI verifies that projects perform according to targeted sustainability requirements. After several independent reviews performed by GBCI, it awarded Rajawali project phase 2 a LEED Certified certificate.