EA FOR WHITE MFOLOZI RIVER BRIDGE AND L2598 LINK ROAD


BASIC ASSESSMENT REPORT FOR THE PROPOSED FIRHAM-PLATRAND 88KV POWERLINE DEVIATION NEAR STANDERTON. 

Review period: 02 May 2018 to 02 June 2018


EA FOR THE PROPOSED CONSTRUCTION OF A BRIDGE OVER THE ROOISLOOT RIVER AND VARIOUS CULVERTS ASSOCIATED WITH THE N11-13X, MOKOPANE RING ROAD.


MOZAMBIQUE BORDER WALL


PART 2 ENVIRONMENTAL AUTHORISATION AMENDMENT FOR THE BOKPOORT 75MW CSP.

The review period is from 14 March 2018 to 14 April 2018.

 


EA FOR P50-1 REHABILITATION FROM KM 17.34 TO KM 26.00


EA FOR TINLEY MANOR SOUTHBANKS DEVELOPMENT


ENVIRONMENTAL AUTHORISATION FOR REHABILITATION OF A CULVERT ALONG THE P230

 


FINAL CONSULTATION BASIC ASSESSMENT REPORTS FOR THE BRIDGE, CULVERTS AND BORROW PITS ASSOCIATED WITH THE N11-13 X MOKOPANE RING ROAD, LIMPOPO PROVINCE

 


NOTICE OF SUBMUSSION OF THE FINAL BASIC ASSESSMENT REPORT: BASIC ASSESSMENT FOR THE WHITE MFOLOZI RIVER BRIDGE AND THE L2598 LINK ROAD, ULUNDI LOCAL MUNICIPALITY (REF- DC26/0015/2017)