As part of a number of urban initiatives such as red routes, junction improvements, bus station improvements and provision of cycle facilities within Walsall’s Metropolitan Borough, Royal HaskoningDHV have been appointed to undertake a range of Road Safety Audits and Safety Reviews, which include the following projects:

A4148 Broadway Red Routes, Walsall     Stage 2 Audit (Detailed Design) – 2011
Audit of alterations to road markings and junction geometry associated with implementation of bus route improvements around A4148 Broadway, Walsall.

Bradford Place, Walsall   Stage 2 Audit (Detailed Design) – 2011
Highway works & pedestrian improvements associated with bus stop improvements in Walsall town centre.

Route 529 Walsall Bus Showcase & Red Route     Stage 3 Audit (Completion of Construction) – 2011
Reallocation of road space, residential car parking and alterations to traffic signal controlled junction as part of bus route improvements on route between Walsall and Wolverhampton.

Proposed Cycle Route, Birmingham Road, Aldridge   Stage 2 Audit (Detailed Design) – 2013
Priority junction reconfiguration comprising closure to service road to provide extension of existing cycle facilities at heavily trafficked location, two differing options presented for Audit.

A34 Birmingham Rd / A4148 Broadway / Broadway North, Walsall  Stage 1 (Preliminary Design) - 2013

Alterations to existing double roundabout including gap closure, carriageway markings, lane splitter island, modified pedestrian facilities and reallocation of road space on approaches.

Contact us

Related markets

Related services