Our client, a multinational textile manufacturer in Europe, needed to optimise its operations while increasing flexibility and production capacity.

Our business case analysis revealed that the required capital investment could actually be reduced by €33 million and identified annual savings of €3.5 million in operating expenses. Furthermore, it showed that existing manufacturing sites are able to cope with future challenges.

The study helped management in their strategic decision making and future proofed the reliability of the existing plants.