Location: Long An province, Vietnam

Located in the heart of Ben Luc District, Vam Co Dong New Urban can be called the gateway between Ho Chi Minh City and provinces in the Mekong Delta owing to lying in the west of the National Highway 1A and connecting directly with the Ho Chi Minh City-Trung Luong Expressway. It takes only 30 minutes driving from there to the downtown area in Ho Chi Minh City’s District 1. Vam Co Dong, New Urban which three faces are surrounded by water, is an ideal ecological environment for such a riverside peninsula.

The land area of this project is around 355 ha. It promises to be a model urban city for Long An province in particular and for the whole country in general.

Nam Long Investment Corporation awarded a service of basic design for M&E Infrastructure to Royal HaskoningDHV Vietnam. Royal HaskoningDHV provided the basic design for the following systems: storm drainage, water supply, fire fighting,sanitary drainage, power supply, telecommunication & external lighting.

Contact us

Bas van Dijk

Resident Director

Ho Chi Minh city, VN

Send message Send message