The overall objective of the Mekong Delta Transport Infrastructure Development Project (MDTIDP) is to support sustainable economic growth and include development in the Mekong Delta Region by increasing the efficiency of transport infrastructure in the Delta in an integrated and safe manner by means of multi-modal transport.


The scope of the Integrated Project Implementation Audit Services (IPIA) is to conduct semi-annual reviews of the status of all project elements and bring together progress under one report to be presented prior to each World Bank supervision mission. Specifically the IPIA will check that works are being carried out to agreed designs and specifications and are of good technical quality; that Bank’s environmental and social safeguard plans and policies are being adhered to, and; to identify difficulties arising or anticipated during project implementation, analyse causes and propose solutions. 

Client: PMU-SIW/World Bank

Contact us