Lippo embarks on a journey to re-develop an area of land at Lippo Karawaci in Kabupaten Tangerang that covers about 150ha of existing commercial and residential area. The master plan for re-development envisages a mix between residential, commercial and very dense mixed land use growths. The ongoing development in the area has occasional flood problems which obstructed traffic in the existing urban area.

Lippo appointed Royal HaskoningDHV to carry out the flood control study concerning short term solutions for flood control, and assist the urban planners concerning improvements for flood control on the longer term, integrated in overall master plan. The above required close coordination with the Client and the urban planners to provide an integrated plan.

Our Solution
Royal HaskoningDHV provided four main steps for this project:

  • Site reconnaissance
  • Overall drainage plan
  • Run-off calculations and proposed dimensions of the main drainage system, based on the results of a topographical survey
  • Conceptual design and cost estimate

Main aspect is to provide attractive solutions for creation of retention capacity. In this way the unavoidable extra drainage flows can be stored in the area, to ensure that there is no extra burden on the environment (DQ = 0 policy). At the other hand ponds can be an attractive living environment for recreation, temperature moderation, spatial experience etc.

The Outcome
The study improves the environment by successfully solving the flood problems especially in creating a sustainable attractive living environment and allowing unhindered traffic at the existing urban area

Contact us

Marco Piët

Director Advisory Group Urban Water Management

Jakarta, ID

Send message Send message

Related markets