Conwy platform © HSM-EOG resources
 
The Conwy platform will be tied-back via a 12-kilometer (7.5-mile) 8-inch production flowline to the BHP Billiton-operated Douglas platform, situated on Block 110/13b. Gas will be mixed with the nearby Douglas production and used either for power generation or re-exported to shore using an existing pipeline to the Point of Ayr terminal. First oil was received in 2012.

Royal HaskoningDHV was involved as Health, Safety & Environment (HSE) consultant during the design of the three topsides by engineering firm IV Oil & Gas.

The activities comprised of:
  • Engineering studies, such as HAZID & HAZOP reviews and SIL Assessments.
  • Safety Studies, such as: Fire & Explosion Hazard Assessments, Escape, Evacuation & Rescue Assessments, Quantitative Risk Assessments (QRA)
  • CFD Analysis: Explosion Overpressure Assessments, Smoke Flow & Dispersion Analysis
  • Development and preparation of Health & Safety Documents for Safety Case development

EOG Resources, Inc. is one of the largest independent (non-integrated) crude oil and natural gas companies in the United States with proved reserves in the United States, Canada, Trinidad, the United Kingdom and China.