The Challenge

Camau phase 1 and 2 project are parts of the Ca Mau gas-power fertilizer complex in the southern-most province of Ca Mau, and was designed to be operated by either gas or fuel oil with a capacity of 750 MW in the first phase. The plant consisted of two gas turbines, two heat recovery steam generators, and one steam turbine. The two gas turbines were expected to generate power by early 2007; the complete power plant was scheduled for commercial operation in December 2007.

Our Solution

Based on the conceptual design provided by the Client requirements for different types of process equipment and local requirements, Royal HaskoningDHV conducted calculation and drawing for detail construction level which taken into account the constructability on site, i.e. structural steel work transportation and rebar installation on site.  Detail of bar bending schedule calculated based on French regulation also part of the work.

The Outcome

All buildings for lot 4, comprising architectural, structural and mechanical & electrical, general site (roads, drains, lighting), and most of the non-technical buildings, including the admin building, switchyard control building, central control building, workshop, warehouse, canteen, etc. are now in good function as required. The factory now can have sufficient capacity for producing and supplying power to the Southern part of the country.

Contact us

Lars Crombach

Managing Director HaskoningDHV Vietnam Ltd.

Ho Chi Minh City, VN

Send message Send message