Facts & Figures

 ClientWater Authority Stichtse Rijnlanden (NL)
 LocationUtrecht, The Netherlands
 Operation Start2014 - 2021
 WastewaterMunicipal
 Project TypeGreenfield
 Process ConfigurationPROCESS
 Nereda Design Capacity:
  • Dry Weather Flow1,500 m3/day
  • Peak Flow600 m3/hour 
  • PE9,000 p.e. (54 g BOD)

About the Utrecht Pilot Nereda WWTP

The existing aged treatment plant (343,000 p.e.) in the heart of the city of Utrecht requires replacement and also needs upgrading to meet more stringent effluent requirements.  In order to enable the most economic design tailored to the characteristics of the wastewater, the client decided to construct one 1,500 m3 module to determine optimized design parameters for the full plant retrofit.

Nereda WWTP Utrecht, the Netherlands | Royal HaskoningDHV

Image: Nereda pilot plant in Utrecht

 

Contact Us

René Noppeney

Global Director Water Products & Innovation

Nijmegen, NL

Send message Send message

Nereda® Videos

All videos over Nereda® Technology