Facts & Figures

 ClientWaterschapsbedrijf Limburg
 LocationPanheel, The Netherlands
 Operation Start2020
 WastewaterMunicipal
 Project TypeBrownfield
 Process Configuration ---
 Nereda Design Capacity:
  • Dry Weather Flow6,525 m3/d
  • Peak Flow1,088 m3/h
  • PE28,100 PE (PE = 60 gBOD/d)
 In the Media: 

About the Nereda® WWTP Panheel 

The challenge

In order to comply with the much more stringent regulations for effluent water quality (KRW) in 2021, the old WWTP at Panheel from 1984 had to be replaced. The Water Authority of Limburg (WBL) selected Nereda as their technology of choice in accordance with their own Verdygo® concept.

Since their wwtp at Stein is about the same size as Panheel it was decided to design and build twe new plants at the same time. For both plants an identical 40.000 p.e. Verdygo Module has been developed in cooperation with Mobilis, Engie and Eliquo.

The solution

The Verdygo concept is a sustainable approach with a modular construction technique. By using modules built above ground, components can be added or removed, making it a flexible construction for future changes.

Nereda was selected as the technology of choice for Verdygo. After successful implementation at Simpelveld in 2015 and Weert in 2019,  this will be the third and fourth Nereda in Limburg.

Because of the small footprint of Nereda, the client has been able to build the new plant next to the existing plant on the existing plot of land. Once the Nereda plant is operational in 2021, the existing plant will be decommissioned and amovated.

The outcome

The WWTP in Panheel will treat the wastewater of 38,500 people and live up to the new strict effluent requirements.

 

 

Nereda® Videos

All videos over Nereda® Technology